• Over 50 deep (20m) environmental/geotechnical and ground water monitoring well holes drilled using our large drill rig. The results from these holes were used for the initial environmental and geotechnical assessment of the site at the inception of the project in 2011
  • Installation of 20 ground water monitoring wells in 2015 to enable the ongoing environmental monitoring of the New Royal Adelaide Hospital operations.
  • Numerous shallow (up to 6m) environmental soil samples taken using a Rockmaster drill rig for the environmental assessment of the site
  • All drilling works have been completed under the strict NRAH OH&S guidelines